to see works from the beginning, start at the end. Newest photos are just below this photo.

06 January 2012

Footings, brickwork and groundworks............

Here's the new garage footings

Airways to the original building under the footings

Dpc in the garage footings

Dpc and insulation under the concrete underbase

Wire mesh on top of that, for strength

Finally finished as it gets dark.  All footings laid.

Clearing the debris and digging the footings ready for the new double garage and the new master bedroom suite!.....

Here's the footings for the new master bedroom suite...

The new master bedroom suite is being built on the end of the bungalow and will be a generous size!


Preparing for the new double detached garage

New footings......

The master bedroom suite

Driveway and garden area too....

Demolition of the existing single garage begins.....

The original Single flat roofed garage


 The Digger arrives to demolish the single garage

 Going....

 Going.....

 Gone!!